middle.news

Altair’s South Oko gold system widens as drilling accelerates

4:31pm on Friday 30th of October, 2026 AEDT • Mining
Read Story

Altair’s South Oko gold system widens as drilling accelerates

4:31pm on Friday 30th of October, 2026 AEDT
Key Points
  • 10m at 10.15g/t gold from South Oko’s W1 target
  • Gold intersected in all six deep W1 trenches across a 1.0km by 1.2km area
  • Greater Oko expanded by 29km² to 457km² through a binding permit option
  • Three rigs active within a fully funded 75,000m drilling program
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Altair Minerals (ASX:ALR)
OPEN ARTICLE