middle.news
TerraNova prepares to drill after Nielle gold target reaches 1.4Moz conceptual upside
12:25pm on Friday 30th of October, 2026 AEDT
•
Mining
Read Story
TerraNova prepares to drill after Nielle gold target reaches 1.4Moz conceptual upside
12:25pm on Friday 30th of October, 2026 AEDT
Key Points
Six priority gold targets defined across the 212km² Nielle project
Conceptual Target 1 estimate of 17-26Mt at 1.4-1.7g/t gold
2,500-3,000m RC and diamond drilling being prepared
$4.075m placement completed at $0.075 per share
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Terranova Metals (ASX:TNM)
OPEN ARTICLE