middle.news

TerraNova prepares to drill after Nielle gold target reaches 1.4Moz conceptual upside

12:25pm on Friday 30th of October, 2026 AEDT • Mining
Read Story

TerraNova prepares to drill after Nielle gold target reaches 1.4Moz conceptual upside

12:25pm on Friday 30th of October, 2026 AEDT
Key Points
  • Six priority gold targets defined across the 212km² Nielle project
  • Conceptual Target 1 estimate of 17-26Mt at 1.4-1.7g/t gold
  • 2,500-3,000m RC and diamond drilling being prepared
  • $4.075m placement completed at $0.075 per share
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Terranova Metals (ASX:TNM)
OPEN ARTICLE