middle.news

Karoon unlocks a leaner path for Neon offshore Brazil

9:01am on Monday 9th of November, 2026 AEDT • Oil and Gas
Read Story

Karoon unlocks a leaner path for Neon offshore Brazil

9:01am on Monday 9th of November, 2026 AEDT
Key Points
  • Neon Phase 1 moves into FEED with US$800-950 million capital estimate
  • Targeting approximately 60 MMbbl recovery and 25,000-30,000 bopd peak production
  • Preliminary post-tax, unlevered IRR in the mid-20% range
  • TechnipFMC subsea MOU and Piranema Spirit FPSO exclusivity agreed
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Karoon Energy (ASX:KAR)
OPEN ARTICLE