middle.news

Orbminco’s three-pit plan moves Majestic North closer to production

11:23am on Monday 9th of November, 2026 AEDT • Mining
Read Story

Orbminco’s three-pit plan moves Majestic North closer to production

11:23am on Monday 9th of November, 2026 AEDT
Key Points
  • All drilling, geotechnical, hydrogeological and environmental field work completed
  • Stage 1 redesigned as three shallow pits targeting higher-grade mineralisation
  • 1.38 million tonnes at 1.14 g/t gold resource contains about 50,300 ounces
  • Metallurgy confirms free-milling ore recoverable by conventional leaching
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Orbminco (ASX:OB1)
OPEN ARTICLE