middle.news
ADX locks in January rig for 8.3 BCF Austrian gas prospect
11:32am on Thursday 12th of November, 2026 AEDT
•
Oil and Gas
Read Story
ADX locks in January rig for 8.3 BCF Austrian gas prospect
11:32am on Thursday 12th of November, 2026 AEDT
Key Points
Rig mobilisation scheduled for 4 January 2027
14-day GOLD-1 drilling program in Upper Austria
8.3 BCF mean prospective resource estimate
Empyrean to earn 10% economic interest by funding 20% of well costs
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
ADX Energy (ASX:ADX)
OPEN ARTICLE