middle.news

Alkane uncovers open copper-zinc sulphide system at Rockley

8:32am on Wednesday 18th of November, 2026 AEDT • Mining
Read Story

Alkane uncovers open copper-zinc sulphide system at Rockley

8:32am on Wednesday 18th of November, 2026 AEDT
Key Points
  • 45.2 metres at 0.55% copper and 1.15% zinc in BEL001
  • 33.1 metres at 0.44% copper and 0.54% zinc in BEL002
  • Higher-grade intervals reached 4.74% copper and 5.64% zinc
  • Mineralisation interpreted along an open 1.7-kilometre limestone horizon
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Alkane Resources (ASX:ALK)
OPEN ARTICLE