Gorilla uncovers new high-grade zones at Vivien

Gorilla Gold Mines has reported strong new gold intercepts at its Vivien project, including 5.7 metres at 19.7g/t and a deeper 0.5-metre hit at 33.8g/t. The results add exploration momentum to the company’s emerging Leinster Hub, but remain early-stage drilling results rather than a resource upgrade.

  • 5.7m at 19.7g/t gold intersected at the Vince prospect
  • 0.5m at 33.8g/t gold identified in a new deep Vince lode
  • Val returns 0.9m at 15.7g/t gold near existing mine infrastructure
  • Vivien has a 278,000oz mineral resource and fully permitted underground mine
  • Further drilling, assays and DHEM surveys are planned
An image related to Gorilla Gold Mines Ltd A photo of the logo for Gorilla Gold Mines Add us as a preferred source on Google
Image © middle. Logo © respective owner.

Vince drilling delivers multiple high-grade intercepts

Gorilla Gold Mines Ltd (ASX:GG8) has added some conspicuous high-grade results to its Vivien exploration story, with the strongest new intersection returning 5.7 metres at 19.7g/t gold from 243 metres in hole VIVEX028 at the Vince prospect. The hit sits about 100 metres along strike from the previously reported 2.1 metres at 55.4g/t gold in VIVEX012.

Detail long section of the Vince prospect, looking north-west, showing intercepts within 100m of the section and planned fence drilling (fences F1–F4, 40m apar…
Caption and image © Gorilla Gold Mines Ltd. From “High-Grade Gold Results from Leinster Hub”, 24 Nov 2026.

The same hole also returned 1.5 metres at 7.8g/t gold from 225.4 metres in a parallel lode and a shallow 0.4-metre intersection at 22.0g/t from 36.6 metres. A second hole, VIVEX029, cut a new deeper lode with 0.5 metres at 33.8g/t gold from 674.9 metres, about 590 metres below surface. Gorilla said that lode is associated with a quartz-arsenopyrite-chalcopyrite vein.

Val mineralisation sits close to mine infrastructure

Vivien drilling plan showing results from this release, Mineral Resource wireframes, the Vivien underground workings, planned fence drilling at Vince (each col…
Caption and image © Gorilla Gold Mines Ltd. From “High-Grade Gold Results from Leinster Hub”, 24 Nov 2026.

At Val, hole VIVEX022 returned 0.9 metres at 15.7g/t gold from 142.3 metres, while VIVEX023 recorded 1.0 metre at 3.7g/t from 142.6 metres. The upper Val system is approximately 100 metres below surface and around 30 metres from the Vivien open-pit wall, with the company also describing it as close to existing underground infrastructure.

Val mineralisation now extends over more than 400 metres of strike and 400 metres down-dip across multiple parallel lodes, according to the release. The company says the pyrrhotite-associated mineralisation responds well to downhole electromagnetic surveys, which it plans to use alongside drilling to refine targets. The results add to the momentum from the earlier Vivien drilling, which reported growth at Val and a high-grade Vince intersection.

Cosmos acquisition gives discoveries a potential processing route

Location of Vivien Project
Caption and image © Gorilla Gold Mines Ltd. From “High-Grade Gold Results from Leinster Hub”, 24 Nov 2026.

Vivien carries a mineral resource of 278,000 ounces at 4.1g/t gold and includes a fully permitted underground mine. Gorilla is positioning the project alongside the Cosmos Project, acquired from IGO under the Cosmos project deal, with Cosmos providing a mill 68 kilometres from Vivien by sealed road. That infrastructure could give the new Val and Vince discoveries a potential development pathway, although the release does not present an updated resource, reserve or development study.

Exploration is continuing at Vince. Diamond hole VIVEX036 is targeting the deep lode identified in VIVEX029, an RC rig is being mobilised to accelerate the programme, and results remain pending for holes VIVEX032 to VIVEX035. Four earlier holes, VIVEX026, VIVEX027, VIVEX030 and VIVEX031, returned no significant intercepts above the stated 0.5g/t gold reporting cut-off.

True widths and continuity remain unresolved

The headline grades are exploration results reported as downhole widths; true widths have not yet been determined. The company’s current Vivien resource therefore remains unchanged, and the commercial significance of the new intersections will depend on whether follow-up drilling establishes continuity, scale and geometry sufficient to support future resource work.

Location of GG8 Projects in WA
Caption and image © Gorilla Gold Mines Ltd. From “High-Grade Gold Results from Leinster Hub”, 24 Nov 2026.

Gorilla also says dewatering of the existing underground mine, under an agreement with Gold Fields Agnew, is scheduled to commence soon. The next meaningful tests are whether the deep Vince lode repeats beyond a single intercept, whether Val’s near-infrastructure mineralisation can be connected into a coherent resource, and how quickly the Leinster Hub moves from a collection of promising drill results towards a defined development plan.

Get ASX:GG8 news the moment it breaks

Instant push notifications No waitlist Free
Download on the App Store iPhone & iPad
Get it on Google Play Android
Email alerts

Bottom Line?

The drilling has strengthened Vivien’s discovery case, but the next assays and follow-up holes must convert isolated high-grade hits into demonstrated continuity before the Leinster Hub’s development potential can be properly assessed.

Questions in the middle?

  • Will VIVEX036 and the pending VIVEX032 to VIVEX035 results confirm continuity of the deep Vince lode?
  • Can Val’s mineralisation near the open pit and underground workings support a meaningful resource expansion?
  • How will dewatering progress and the Cosmos mill acquisition shape the timing of any future Vivien development studies?

Sources

1