middle.news
PC Gold’s Spring Hill study points to a sizeable gold development
8:23am on Tuesday 24th of November, 2026 AEDT
•
Mining
Read Story
PC Gold’s Spring Hill study points to a sizeable gold development
8:23am on Tuesday 24th of November, 2026 AEDT
Key Points
951koz maiden Probable Ore Reserve from 35.5Mt at 0.83g/t gold
A$1.591bn pre-tax NPV and 66% IRR at A$5,500/oz
4Mtpa open pit and underground operation targeting 1.028Moz recovered gold
A$413m pre-production capital still required after FID
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
PC Gold (ASX:PC2)
OPEN ARTICLE