middle.news
Galan Lithium’s Hombre Muerto West Nears Production with Nano-Filtration Plant En Route
9:46am on Monday 15th of December, 2025 AEDT
•
Mining
Read Story
Galan Lithium’s Hombre Muerto West Nears Production with Nano-Filtration Plant En Route
9:46am on Monday 15th of December, 2025 AEDT
Key Points
Nano-filtration plant assembled, tested, and now shipping to site
Evaporation ponds redesigned and liners installed to support Phase 1 output
Phase 1 construction on track for lithium chloride production in H1 2026
Potential expansion of Phase 1 production capacity under evaluation
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Galan Lithium (ASX:GLN)
OPEN ARTICLE