middle.news

Galan Lithium’s Hombre Muerto West Nears Production with Nano-Filtration Plant En Route

9:46am on Monday 15th of December, 2025 AEDT Mining
Read Story

Galan Lithium’s Hombre Muerto West Nears Production with Nano-Filtration Plant En Route

9:46am on Monday 15th of December, 2025 AEDT
Key Points
  • Nano-filtration plant assembled, tested, and now shipping to site
  • Evaporation ponds redesigned and liners installed to support Phase 1 output
  • Phase 1 construction on track for lithium chloride production in H1 2026
  • Potential expansion of Phase 1 production capacity under evaluation
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Galan Lithium (ASX:GLN)
OPEN ARTICLE