middle.news
Yandal Resources Maps 1.2km Gold Mineralisation at Arrakis, Eyes 2026 Drilling Surge
11:40am on Saturday 14th of February, 2026 AEDT
•
Mining
Read Story
Yandal Resources Maps 1.2km Gold Mineralisation at Arrakis, Eyes 2026 Drilling Surge
11:40am on Saturday 14th of February, 2026 AEDT
Key Points
Completion of 17-hole, 3,800m RC drilling program at Arrakis
Primary mineralised structure mapped over 1.2km strike length
Evidence of both shallow broad and deeper high-grade gold mineralisation
Diamond and air-core drilling support geological model indicating strike change
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
YRL
OPEN ARTICLE