middle.news

Yandal Resources Maps 1.2km Gold Mineralisation at Arrakis, Eyes 2026 Drilling Surge

11:40am on Saturday 14th of February, 2026 AEDT Mining
Read Story

Yandal Resources Maps 1.2km Gold Mineralisation at Arrakis, Eyes 2026 Drilling Surge

11:40am on Saturday 14th of February, 2026 AEDT
Key Points
  • Completion of 17-hole, 3,800m RC drilling program at Arrakis
  • Primary mineralised structure mapped over 1.2km strike length
  • Evidence of both shallow broad and deeper high-grade gold mineralisation
  • Diamond and air-core drilling support geological model indicating strike change
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about YRL
OPEN ARTICLE