British Hill Drilling Yields 7m at 7.01 g/t and 9m at 5.05 g/t Gold Intercepts
Forrestania Resources has confirmed significant high-grade gold mineralisation extending deeper and along strike at its British Hill project, following its maiden drilling program. The results bolster prospects for expanding the resource and advancing development plans.
- Maiden British Hill drill program completed with 10 holes totaling 2,906m
- Second batch of assays confirms multiple high-grade gold zones
- Notable intercepts include 7m at 7.01 g/t and 9m at 5.05 g/t gold
- Mineralisation extends down dip to the east, supporting resource growth
- Project benefits from granted mining lease and proximity to Lake Johnston processing
Maiden Drill Program Delivers Encouraging Results
Forrestania Resources Limited (ASX:FRS) has announced promising assay results from its inaugural drilling campaign at the British Hill Gold Project in Western Australia. The program, comprising 10 drill holes totaling just under 3,000 metres, has confirmed multiple zones of high-grade gold mineralisation extending both at depth and along strike.
The second tranche of assay data highlights significant intercepts such as 7 metres grading 7.01 grams per tonne (g/t) gold from 120 metres and 9 metres at 5.05 g/t from 197 metres, including higher-grade sub-intervals. These results reinforce the geological model of a robust mineralised system with potential for resource expansion.
Strategic Location and Project Advantages
British Hill is situated on a granted mining lease within the prolific Yilgarn Mineral Field, approximately 75 kilometres south-southeast of Southern Cross. Its proximity to Forrestania’s Lake Johnston processing facility offers a strategic advantage, potentially reducing development costs and accelerating project timelines.
Chairman David Geraghty emphasised the significance of the results, noting that the drilling has enhanced understanding of the deposit and supports the company’s intent to grow the Mineral Resource Estimate (MRE). The granted mining lease status further positions British Hill as a compelling development opportunity within Forrestania’s growing portfolio.
Technical Insights and Next Steps
The drilling program combined reverse circulation (RC) and diamond tail techniques to test mineralisation continuity and depth extensions. Assays were conducted with rigorous quality control protocols, ensuring reliability of the data. While true widths of mineralisation remain to be confirmed, the down-hole intercepts indicate substantial high-grade zones that warrant further exploration.
Looking ahead, Forrestania plans to undertake infill drilling aimed at upgrading Inferred Resources to Indicated status, a critical step towards resource delineation suitable for mining studies. Concurrently, the company is exploring milling options to process British Hill ore, an essential component of project monetisation.
Historic drilling and exploration data, alongside the current results, suggest additional potential to expand the resource base. Forrestania’s methodical approach to exploration and development underscores its commitment to unlocking value from its Western Australian assets.
Bottom Line?
With high-grade extensions confirmed and development pathways clear, Forrestania’s British Hill project is poised for a pivotal growth phase.
Questions in the middle?
- How will forthcoming assay results influence the overall resource estimate at British Hill?
- What are the timelines and terms for securing milling options to process the ore?
- To what extent can infill drilling convert Inferred Resources into mineable Indicated Resources?