middle.news

Metro Mining targets recovery after resetting 2026 shipment guidance

5:14pm on Monday 19th of October, 2026 AEDT • Mining
Read Story

Metro Mining targets recovery after resetting 2026 shipment guidance

5:14pm on Monday 19th of October, 2026 AEDT
Key Points
  • 2026 shipment guidance revised to 6.0-6.5 million WMT
  • September performance fell below plan
  • Channel bed-levelling campaign under way at Bauxite Hills
  • October ore haulage reached 463,000 WMT by 17 October
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Metro Mining (ASX:MMI)
OPEN ARTICLE