middle.news
Jade Opens New Red Lake Test With Mongolia’s First Multilateral CBM Well
9:16am on Thursday 19th of November, 2026 AEDT
•
Oil and Gas
Read Story
Jade Opens New Red Lake Test With Mongolia’s First Multilateral CBM Well
9:16am on Thursday 19th of November, 2026 AEDT
Key Points
First multilateral CBM well completed at Red Lake
2,642 metres of in-seam drilling across four lateral branches
Pump installed and workovers underway on two existing wells
Coordinated dewatering expected before the end of November
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Jade Gas (ASX:JGH)
OPEN ARTICLE