Latest Kinetiko Energy (ASX:KKO) News

Page 2
Page 2 of 2

Kinetiko Energy Accelerates Gas Production with Second Brakfontein Well

Kinetiko Energy has commenced drilling its second production test well at Brakfontein, applying optimized protocols following promising initial results. This marks a key step toward supplying gas to a pilot LNG plant planned for late 2026.
Maxwell Dee
27 Aug 2025

Kinetiko Energy Hits Strong Gas Flow at Brakfontein Well 271-KA03PT10

Kinetiko Energy reports a peak gas flow rate of 370 Mscfd from its optimised drilling at the Brakfontein well 271-KA03PT10, advancing its South African gas project.
Maxwell Dee
18 Aug 2025

Kinetiko Energy Accelerates Gas Production with New Well and LNG JV Plans

Kinetiko Energy has spudded its third gas production test well at Brakfontein and signed a non-binding term sheet with FFS Refiners to co-develop a pilot LNG plant, backed by a recent $2.2 million capital raise.
Maxwell Dee
25 July 2025

Kinetiko Energy Drills Ahead with South Africa LNG Pilot, Eyes 6 TCF Methane Boost

Kinetiko Energy has begun drilling a key production test well in South Africa, advancing its transition from exploration to gas production with plans for a pilot LNG plant by late 2026.
Maxwell Dee
24 July 2025

Kinetiko and FFS Refiners Partner to Accelerate LNG Pilot Production in South Africa

Kinetiko Energy has signed a non-binding term sheet with FFS Refiners to co-develop a pilot LNG plant at Brakfontein, aiming to fast-track gas production and supply to South Africa's industrial market.
Maxwell Dee
1 July 2025

Kinetiko Energy Secures $2.2M to Fuel South African Gas Ambitions

Kinetiko Energy has completed a $2.2 million placement, supported by directors and major shareholders, to advance its gas exploration and production testing in South Africa’s Mpumalanga Province. Initial production test results are expected in July 2025.
Maxwell Dee
12 June 2025

Kinetiko Energy Advances South Africa’s Onshore Gas with New Well and 6 TCF Resource

Kinetiko Energy has spudded a new production test well in South Africa, aiming to unlock a substantial 6.0 TCF conventional gas resource that could ease the country’s energy crisis. Optimized drilling techniques are expected to overcome earlier flow challenges, accelerating the path to commercial gas production.
Maxwell Dee
15 May 2025

Kinetiko Energy Advances Third Gas Well with New Drilling Tech for 2026 LNG Pilot

Kinetiko Energy has begun drilling its third production test well at Brakfontein, applying revised techniques to boost gas recovery ahead of a planned 2026 micro LNG plant launch.
Maxwell Dee
14 May 2025

Kinetiko Energy Boosts Gas Output with Drilling Optimisation in South Africa

Kinetiko Energy reports encouraging progress in South African gas exploration, with improved well performance and a drilling optimisation study revealing key production enhancements.
Maxwell Dee
30 Apr 2025

Kinetiko Energy Confirms Rising Gas Flows, Launches Drilling Optimization Study

Kinetiko Energy reports sustained and improving gas flows from its South African test wells, prompting a drilling optimization study to enhance recovery and support future production.
Maxwell Dee
11 Feb 2025

Kinetiko Energy Advances Despite First Well Setback in Five-Well Test Program

Kinetiko Energy reports mixed results from its five-well gas production test program, with the first well underperforming but the company maintaining optimism for the remaining wells and a strong financial footing.
Maxwell Dee
31 Jan 2025