Logo of Patagonia Lithium (ASX:PL3)Latest Patagonia Lithium (ASX:PL3) News

Page 1
Page 1 of 5

Patagonia Lithium Confirms Robust Porosity and Lithium Grades at Well 7

Patagonia Lithium’s Well 7 delivers strong porosity alignment between core and gamma surveys, with lithium levels near project averages. Preparations for Well 8 pump testing advance, while plans for Well 9 await regulatory approval.
Maxwell Dee
19 Aug 2026

Patagonia Lithium Well 8 Reaches 485m with Strong Lithium Brine Flow

Patagonia Lithium’s Well 8 at the Cilon project hit basement at 485m, delivering promising lithium assays and robust brine flow rates. Plans for porosity testing and a 72-hour pump test are underway to refine resource estimates.
Maxwell Dee
11 Aug 2026

Patagonia Lithium Advances Resource Estimate with Strong Well Data from Seven Holes

Patagonia Lithium has received an interim technical report confirming promising porosity and lithium assay results from seven wells, setting the stage for a final resource estimate after well eight completion.
Maxwell Dee
3 Aug 2026

Materials Wrap - Week 31 (27 July -> 31 July) 2026

Carnaby led the market after Evolution Mining agreed to a A$213 million takeover. Coal and lithium names fell despite major production and funding news.
Across materials, investors rewarded deals and cash flow, but punished large capital needs and weak price follow-through.
Logan Eniac
1 Aug 2026

Patagonia Lithium Advances Drilling and Resource Updates with $9.3m Cash Buffer

Patagonia Lithium (ASX:PL3) reported solid progress in its June quarter, hitting key milestones in drilling, pump testing, and resource modelling at its Argentine lithium brine projects, supported by a strong cash position following recent capital raises.
Maxwell Dee
30 July 2026

Patagonia Lithium Reports Strong Packer Flow Rates and Positive Lithium Indicators at Well 8

Patagonia Lithium's Well 8 at the Formentera/Cilon project in Argentina has delivered impressive packer test flow rates up to 705 L/hr at 257m depth, alongside rising specific gravity and total dissolved solids that hint at promising lithium concentrations.
Maxwell Dee
27 July 2026

Patagonia Lithium Extends Drilling to 200m at Cilon Well 8 with Promising Brine Flow

Patagonia Lithium has reached 200 metres depth at Cilon Well 8, reporting strong brine flow rates and specific gravity readings indicative of lithium presence, while confirming no environmental impact from drilling activities.
Maxwell Dee
21 July 2026

Patagonia Lithium Hits 200m at Cilon Well 8 with Strong Brine Flow and Lithium Indicators

Patagonia Lithium advances drilling at its Cilon project, achieving 200 metres depth with promising packer test results showing good aquifer strength and lithium brine characteristics. Environmental assessments confirm no impact, while further pump testing and resource updates are planned.
Maxwell Dee
17 July 2026

Patagonia Lithium Advances Cilon Drilling with Early Signs of High Porosity

Patagonia Lithium has reached 38 metres in drilling Well 8 at its Cilon project in Argentina, with encouraging early core porosity and community approvals progressing.
Maxwell Dee
6 July 2026

Patagonia Lithium Boosts Well 2 Pumping Rate by 58% at Formentera-Cilon Project

Patagonia Lithium has ramped up pumping rates at its Formentera-Cilon lithium brine project with a 58% increase from Well 2, while advancing drilling and testing at Wells 7 and 8. The progress supports ongoing resource upgrades and operational efficiencies.
Maxwell Dee
30 June 2026

Patagonia Lithium Confirms 270ppm Lithium at Formentera Well 7 with High Porosity Zones

Patagonia Lithium’s Well 7 at Formentera delivered a lithium assay of 270ppm at 282m, close to the project average, alongside encouraging porosity and specific yield results that underpin production potential. Drilling will now shift to the Cilon concession, targeting a high-grade lithium zone.
Maxwell Dee
17 June 2026

Patagonia Lithium Secures A$3.4 Million Placement to Accelerate Formentera Drilling and Studies

Patagonia Lithium has locked in A$3.4 million through a placement priced at 10 cents per share, attaching options exercisable at 16 cents. The capital injection aims to fund further drilling, resource upgrades, and a lithium carbonate demonstration plant at its flagship Formentera project.
Maxwell Dee
11 June 2026