Latest Feasibility Studies News

Page 12 of 340
Tennant Minerals has begun the next phase of diamond drilling at its high-grade Bluebird copper-gold-bismuth discovery, targeting extensions and possible repetitions west of the existing resource. The company ended September with $1.91 million in cash, equivalent to about 2.7 quarters of funding on its reported spending rate.
Maxwell Dee
Maxwell Dee
30 Oct 2026
Vulcan Energy’s first matrix reinjection well delivered an estimated 64 standard litres per second, above the 40-litre assumption underpinning Lionheart’s development plan. The technical progress came alongside €98.0 million of quarterly investing outflows and a cash balance of €129.4 million ahead of expected project debt drawdown in Q1 2027.
Victor Sage
Victor Sage
30 Oct 2026
Argosy Minerals has completed key process engineering work and lifted the Rincon Lithium Project’s JORC resource to 790,000 tonnes of Li2CO3. The project is technically advancing, but funding, lithium prices and the final DFS remain significant hurdles.
Maxwell Dee
Maxwell Dee
30 Oct 2026
Caravel Minerals is moving its 100%-owned Caravel Copper Project towards a Definitive Feasibility Study due in the fourth quarter, but the annual report also flags a material uncertainty over its ability to continue as a going concern. The company remains pre-revenue, with approvals, project finance and key commercial arrangements still incomplete.
Maxwell Dee
Maxwell Dee
29 Oct 2026
Impact Minerals is recasting itself as a high-purity alumina developer, with Lake Hope advancing towards a definitive feasibility study and Alluminous reaching pilot-plant milestones. But the annual report also flags a material uncertainty over funding, while a board refresh and managing director departure add to the company’s transition.
Maxwell Dee
Maxwell Dee
29 Oct 2026
Pursuit Minerals has expanded its Argentine exploration push after recording an 809mg/L lithium brine result at depth, securing new environmental approvals and refining gold-silver targets. But with A$0.76 million in cash and just 0.3 quarters of reported funding, the next phase depends on additional capital and further assay results.
Maxwell Dee
Maxwell Dee
29 Oct 2026
Dateline Resources has a funded but halted California gold project after a preliminary injunction suspended Colosseum activities, just as the company completed engineering and advanced financing. Its September quarter also delivered rare earth results of up to 7.13% TREO at Music Valley, but cash fell to A$70.2 million and the reported runway was about 4.2 quarters.
Maxwell Dee
Maxwell Dee
29 Oct 2026
Global Lithium’s September quarter combined a recommended A$333 million cash takeover with a sharply improved development case for its Manna lithium project. The proposed Titan deal remains conditional, while the new study’s strong returns depend on lithium prices, exchange rates and execution.
Maxwell Dee
Maxwell Dee
29 Oct 2026
Southern Palladium has secured a 30-year mining right for its Bengwenyama PGM-Chrome Project, while improved metallurgical test work points to a much larger chrome operation than originally envisaged. The company remains pre-production, with its definitive feasibility study pushed into early 2027 and further approvals and funding still required.
Maxwell Dee
Maxwell Dee
29 Oct 2026
Skylark Minerals has more than tripled the Inferred Resource at its Zaranou Gold Project to 1.20 million ounces and agreed to lift its ownership to 90% for US$1.2 million. The stronger project position arrives alongside A$2.3 million in cash and a disclosed 0.9-quarter funding runway, with a proposed capital raising now central to the next drilling campaign.
Maxwell Dee
Maxwell Dee
29 Oct 2026
Orion Minerals has moved Prieska’s Uppers Mine closer to construction after Glencore’s US$40 million Tranche A financing became unconditional. The company ended September with A$9.62 million in cash, while the larger US$210 million Tranche B package remains conditional.
Maxwell Dee
Maxwell Dee
29 Oct 2026
American Rare Earths has moved Halleck Creek closer to development, expanding the proposed Cowboy State Mine, completing 18 feasibility-stage drill holes and beginning pilot plant processing. But with A$11.0 million in cash and an estimated 1.44 quarters of funding at current outgoings, the next phase will likely require fresh capital or another funding source.
Maxwell Dee
Maxwell Dee
29 Oct 2026

Browse the archive

Full archive