Latest Geological Modelling News

Page 10 of 201
Silver Mines has begun its first modern drilling program at the Kramer Hills gold project in California, targeting shallow oxide mineralisation and possible deeper sulphide zones. The 22-hole campaign will test a conceptual exploration target of up to 445,000 ounces, but the project remains well short of a JORC Mineral Resource.
Maxwell Dee
Maxwell Dee
21 Oct 2026
Evergold Minerals will acquire the Rabbit Warren tenements near Leonora for $50,000 cash and $150,000 in shares, gaining access to a historic gold discovery with an untested 1982 intercept of 3 metres at 23 g/t. The opportunity is inexpensive, but the geological evidence remains largely historical and unverified.
Maxwell Dee
Maxwell Dee
21 Oct 2026
PC Gold has reported a run of thick, stacked gold intercepts at its 1.51Moz Spring Hill project, with five of eight diamond holes delivering best single intercepts of about 70 gram-metres or more. The results add momentum ahead of a targeted December Mineral Resource Estimate update, while coarse-gold sampling and pending assays remain important variables.
Maxwell Dee
Maxwell Dee
21 Oct 2026
Lachlan Star has extended shallow, high-grade gold mineralisation at New Waverley while identifying soil and magnetic anomalies across more than 4km of prospective strike. A project-wide RC drilling program is due to begin in late October, with the company holding $5.203 million in cash at quarter end.
Maxwell Dee
Maxwell Dee
20 Oct 2026
G50 has extended the known strike of its Golconda gold-silver system to more than 1.8km, with shallow high-grade results from the Golden Eagle target. The ASX-listed explorer also finished the quarter with A$25.778 million in cash after a placement backed by Hancock Prospecting.
Maxwell Dee
Maxwell Dee
20 Oct 2026
Neu Horizon Uranium has completed its first major Swedish uranium exploration campaign since listing, generating more than 12,000 line kilometres of airborne data and preparing a maiden drill programme at Storvallflon. The ASX newcomer ended September with A$8.623 million in cash, while assays and target interpretations remain pending.
Maxwell Dee
Maxwell Dee
20 Oct 2026
GoldArc Resources has completed its acquisition of seven Niagara West and Niagara North prospecting licences, extending its contiguous Leonora South exploration corridor. The A$1.5 million upfront price was paid in shares, while a further A$1 million depends on future resource milestones.
Maxwell Dee
Maxwell Dee
20 Oct 2026
Benz Mining has defined a 100-200 metre-wide mineralised system across the first kilometre of the 3km Icon trend, with stacked gold lenses continuing beyond 500 metres vertically. The results add weight to the company’s push for a maiden Glenburgh resource in Q1 2027, while leaving the critical question of true widths and resource scale unresolved.
Maxwell Dee
Maxwell Dee
19 Oct 2026
NewPeak Metals is preparing to drill at least 1,000 metres west of its broad Las Opeñas discovery, where gold grades have increased towards the Belleza Breccia volcanic centre. The funded campaign will test whether the large gold-polymetallic system contains a more valuable gold-dominant core.
Maxwell Dee
Maxwell Dee
19 Oct 2026
QMines has intersected further high-grade copper-gold mineralisation beneath the flooded Mt Chalmers pit, led by 26.2 metres at 2.0% copper equivalent including 2.4 metres at 9.1% CuEq. The results strengthen the geological model and leave mineralisation open, but continuity, true widths and the eventual resource impact remain unconfirmed.
Maxwell Dee
Maxwell Dee
19 Oct 2026
Tungsten Mining has reported broad, deeper-than-modelled tungsten zones from the first 16 holes of its Mt Mulgine expansion program, including a 292-metre intersection at 0.11% WO3. The results strengthen the case for resource growth, but remain exploration results rather than a revised Mineral Resource estimate.
Maxwell Dee
Maxwell Dee
16 Oct 2026
Haranga Resources has opened its second Lincoln drilling campaign with a high-grade 32-metre gold intercept, including a 1-metre section at 51.4g/t. The result is encouraging for a resource-confidence programme, but the reported interval is downhole rather than true width and the campaign remains unfinished.
Maxwell Dee
Maxwell Dee
16 Oct 2026

Browse the archive

Full archive