Latest Metallurgy News

Page 1 of 93
American Rare Earths has converted part of its Wyoming rare earths resource into a maiden Ore Reserve and attached a US$1.3 billion after-tax NPV to the first development phase. The valuation is substantial, but still rests on unconfirmed downstream recoveries, future permits and an unfunded US$840 million construction bill.
Maxwell Dee
Maxwell Dee
19 Nov 2026
Temas Resources has secured an estimated C$52,876 Stage 1 contract to test its Regenerative Chloride Leach technology on samples from an unnamed Québec mineral company. The nearby project could offer a regional processing opportunity, while a new governance appointment reshapes the board.
Victor Sage
Victor Sage
19 Nov 2026
Manhattan Gold has extended the drill-tested strike at its Jaws gold target in Nunavut to 2,258 metres, with a new step-out hole returning shallow gold more than 1km from the nearest 2026 drilling. The results strengthen the case for infill work, although the system remains at an early exploration stage.
Maxwell Dee
Maxwell Dee
19 Nov 2026
Western Mines Group is positioning Mulga Tank for its next valuation test: a scoping study on a shallow, low-grade resource containing 7.2 million tonnes of nickel. The company is also pursuing deeper, potentially higher-grade sulphide zones, while its capital structure leaves little room for costly detours.
Maxwell Dee
Maxwell Dee
18 Nov 2026
Li-FT Power has reported broad, high-grade lithium intersections from the underexplored Galinée Zone at its Adina project in Québec, led by 45 metres at 2.71% Li₂O. The results will feed into a combined resource estimate and preliminary economic assessment targeted for early 2027.
Maxwell Dee
Maxwell Dee
17 Nov 2026
Corazon Mining is evaluating a build-own-operate carbon-in-leach plant at its Chalice Gold Project, with an initial 600,000-tonne annual capacity and expansion potential to 1.8 million tonnes. The proposal could reduce upfront processing capital, but remains non-binding and depends on metallurgy, approvals, funding and a definitive contract.
Maxwell Dee
Maxwell Dee
17 Nov 2026
Mount Ridley Mines has moved 254.1Mt of its Grass Patch scandium resource into the higher-confidence Indicated category, while leaving the overall 946Mt estimate unchanged. The upgrade strengthens the technical basis for economic studies, but the project remains pre-development and most of the resource is still Inferred.
Maxwell Dee
Maxwell Dee
17 Nov 2026
Delta Lithium’s preliminary study assigns Mt Ida a post-tax NPV of A$748 million, with an 11-year mine plan producing spodumene, lepidolite, rubidium and tantalum concentrates. The attractive headline economics come with a substantial caveat: the project still needs around A$500 million, further drilling and feasibility work before construction can be sanctioned.
Maxwell Dee
Maxwell Dee
17 Nov 2026
Corazon Mining is evaluating a modular 600,000-tonne-per-year gold plant at Chalice under a build-own-operate model that could limit its upfront processing capital. The non-binding plan targets a BOO proposal by April 2027 and potential commissioning in Q1 2028, while toll treatment remains available as an interim option.
Maxwell Dee
Maxwell Dee
17 Nov 2026
Aldoro Resources says independent Perth testwork has validated seawater hydrochloric acid leaching for its Kameelburg project, with rare earth extraction broadly matching a freshwater baseline and barium impurity falling sharply. The result supports a conceptual coastal processing model, although scale-up, permitting and further laboratory confirmation remain outstanding.
Maxwell Dee
Maxwell Dee
16 Nov 2026
Manhattan Gold has completed its A$4.5 million placement, removing the shareholder-approval overhang on funding for its Hook Lake exploration program. The company has also disclosed preliminary, non-binding discussions with a US resources group over a possible earn-in and joint venture.
Maxwell Dee
Maxwell Dee
16 Nov 2026
Fortuna Metals has added calculated zircon and monazite estimates to its large Mkanda rutile-graphite resource in Malawi, while deeper drilling points to further growth. The figures remain early-stage: all material is Inferred, and the accessory minerals are not yet recoverable or saleable product estimates.
Maxwell Dee
Maxwell Dee
16 Nov 2026

Browse the archive

Full archive