Latest Mt Chalmers News

Page 1 of 4
QMines has raised more than targeted through a $5.5 million placement, giving its Mt Chalmers copper-gold development a larger funding base as drilling continues. The company also intends to seek a further $1 million from eligible shareholders, although both the SPP and deferred sale proceeds remain subject to completion.
Maxwell Dee
Maxwell Dee
3 Nov 2026
QMines has delivered its strongest pontoon copper intersection so far beneath the flooded Mt Chalmers pit, with mineralisation beginning immediately below the historical floor. The results may add weight to a resource update and feasibility study, while stockpile potential remains unquantified.
Maxwell Dee
Maxwell Dee
29 Oct 2026
QMines has doubled its Mt Chalmers drilling campaign to 20,000 metres while reporting $10.7 million in cash and a further $1.4 million in contracted receivables. The September quarter also delivered a higher Mount Mackenzie resource, fresh Botos drilling and a pipeline of assays that could shape the next resource update.
Maxwell Dee
Maxwell Dee
26 Oct 2026
QMines has intersected further high-grade copper-gold mineralisation beneath the flooded Mt Chalmers pit, led by 26.2 metres at 2.0% copper equivalent including 2.4 metres at 9.1% CuEq. The results strengthen the geological model and leave mineralisation open, but continuity, true widths and the eventual resource impact remain unconfirmed.
Maxwell Dee
Maxwell Dee
19 Oct 2026
QMines has returned its first modern assay results from beneath the flooded Mt Chalmers pit, with two pontoon holes grading nearly 20% above the existing resource model. A high-grade polymetallic lens and 37 pending assays give the drilling campaign a substantial next phase.
Maxwell Dee
Maxwell Dee
7 Oct 2026
QMines has moved its Mt Chalmers copper-gold project into a Definitive Feasibility Study after securing a $15 million strategic package from QIC. The development push comes alongside a larger annual loss, $9.21 million in operating cash outflow and continued reliance on future funding.
Maxwell Dee
Maxwell Dee
30 Sept 2026
QMines has reported a broad 44-metre copper intersection and high-grade zinc-lead-gold-silver mineralisation from six holes at Mt Chalmers. The results support ongoing Definitive Feasibility Study work, while a hole ending in copper mineralisation and upcoming barge drilling add further exploration interest.
Maxwell Dee
Maxwell Dee
23 Sept 2026
QMines is spending $2.388 million on two freehold properties that remove a key access constraint over the Botos deposit near Mt Chalmers. The acquisition clears the way for modern drilling, but the deposit remains an untested conceptual opportunity rather than a defined resource.
Maxwell Dee
Maxwell Dee
18 Sept 2026
QMines Limited reports strong copper and gold intersections from two recent drill holes at Mt Chalmers, reinforcing the project's potential with ongoing drilling and assays.
Maxwell Dee
Maxwell Dee
31 Aug 2026
QMines Limited reported standout copper and gold assay results from two diamond drill holes at Mt Chalmers, surpassing existing resource grades and fueling ongoing feasibility and metallurgical work.
Maxwell Dee
Maxwell Dee
18 Aug 2026
QMines Limited has boosted the Mount Mackenzie gold and silver resource by 32% in gold ounces, with 70% now classified as Indicated, following a comprehensive 73-hole drilling campaign that enhanced geological confidence and resource scale.
Maxwell Dee
Maxwell Dee
5 Aug 2026
QMines Limited has locked in a $15 million strategic funding package with QIC to fully finance its Mt Chalmers Definitive Feasibility Study, while completing a substantial drilling campaign at Mount Mackenzie and launching a major 10,000m drill program at Mt Chalmers.
Maxwell Dee
Maxwell Dee
31 July 2026

Browse the archive

Full archive