Latest Pipeline Infrastructure News

Page 2 of 8
State Gas Limited clears a year-long ATO review to access $4.1 million in R&D tax concessions, enabling debt repayment and bolstering cash reserves. Meanwhile, independent certification of 30.2 petajoules of 2P gas reserves at Rolleston West strengthens its development prospects.
Maxwell Dee
Maxwell Dee
13 July 2026
Channel Infrastructure has unlocked value from decommissioned assets while the Marsden Point Biorefinery project broadens its scope to include fertiliser production, aiming to boost New Zealand’s fuel and economic security.
Maxwell Dee
Maxwell Dee
13 July 2026
Lakes Blue Energy is positioning its Wombat Gas Project as a key contributor to Victoria's energy security and emerging AI infrastructure, with a conceptual study projecting a post-tax NPV10 of A$605 million and first gas in early 2029.
Maxwell Dee
Maxwell Dee
2 July 2026
Bass Oil has secured full ownership of the Vanessa gas field in the Cooper Basin, aiming to resume gas sales by year-end after recommissioning the facility and pipeline.
Maxwell Dee
Maxwell Dee
17 June 2026
ADX Energy’s HOCH-1 well in Upper Austria has revealed 4-6 metres of net gas pay across seven intervals in the Base Hall formation, moving closer to production testing after reaching 1685 metres depth.
Maxwell Dee
Maxwell Dee
11 May 2026
Elixir Energy has successfully completed stimulation and commenced flow testing at its Diona-1 well in Queensland’s Surat-Bowen Basin, with gas and condensate flowing at a notable pressure. The well’s proximity to existing pipeline infrastructure could facilitate rapid commercialisation if further testing confirms sustained production.
Maxwell Dee
Maxwell Dee
11 May 2026
ADX Energy’s HOCH-1 well has been deepened to 1619 metres, revealing six new thin gas sand intervals below the primary Hall Formation target. Wireline logging scheduled for 8 May will verify reservoir quality and gas saturation, with production testing to follow if results confirm the discovery’s potential.
Maxwell Dee
Maxwell Dee
8 May 2026
ADX Energy’s HOCH-1 exploration well in Upper Austria has encountered gas-filled sands consistent with pre-drill 3D seismic predictions, reinforcing the prospect’s resource potential ahead of upcoming wireline logging and production testing.
Maxwell Dee
Maxwell Dee
7 May 2026
ADX Energy is progressing its HOCH-1 shallow gas well in Upper Austria, targeting up to 17.3 BCF of prospective gas resources with drilling at 950 metres depth and plans for two more wells this year.
Maxwell Dee
Maxwell Dee
4 May 2026
Elixir Energy has completed stimulation at its Diona-1 well in Queensland’s Surat-Bowen Basin, observing encouraging gas indications ahead of flow testing. The well’s proximity to major pipeline infrastructure could accelerate commercialisation if results hold.
Maxwell Dee
Maxwell Dee
4 May 2026
H3 Energy confirms promising gas flow potential at Warro and appoints LAB Energy to secure partners for Alinya, while facing a critical cash crunch.
Maxwell Dee
Maxwell Dee
29 Apr 2026
Galilee Energy has transformed its Zydeco Gas Project in Louisiana into a drill-ready asset, aiming for a Q2 2026 spud and first production within six months of success.
Maxwell Dee
Maxwell Dee
29 Apr 2026

Browse the archive

Full archive