Latest Quality Control News

Page 6 of 43
Azzuro Resources has reported robust high-grade copper-gold-zinc-silver mineralisation from its 2026 drilling at the Red Hill VMS Project, with assays confirming thicker and richer sulphide zones than previous drilling. Shallow gold zones extending over 600 metres add to the project's exploration upside.
Maxwell Dee
Maxwell Dee
3 July 2026
49 Metals has confirmed and extended a high-grade gold feeder structure at its Gold Mountain project in Nevada, with drilling revealing significant gold mineralisation and promising signs of a larger epithermal system.
Maxwell Dee
Maxwell Dee
1 July 2026
Beacon Minerals has completed its largest drilling campaign to date at the Iguana deposit, delivering high-grade gold intercepts that underpin a forthcoming resource upgrade.
Maxwell Dee
Maxwell Dee
1 July 2026
Nexus Minerals has completed assay reporting for 33 reverse circulation drill holes at its Clement Prospect, delivering strong high-grade gold results and confirming the system remains open at depth. The findings underpin plans for a maiden Mineral Resource Estimate within the broader Wallbrook project update targeted for September.
Maxwell Dee
Maxwell Dee
1 July 2026
Gold Mountain Limited has reported robust assay results from thirteen diamond drill holes at its Irajuba IR-1 Prospect, expanding the rare earth mineralised footprint beyond initial targets to over 1.2 kilometres.
Maxwell Dee
Maxwell Dee
1 July 2026
Burger Fuel Group posted a 92% surge in net profit to NZ$1.97 million for FY26, driven by steady system sales growth, a one-off store sale gain, and reduced legal expenses, while geopolitical instability in the Middle East weighs on international sales.
Victor Sage
Victor Sage
30 June 2026
Mithril Silver and Gold has upgraded its Target 1 resource at the Copalquin project, delivering a 196% increase in indicated ounces and incorporating mining dilution to better reflect practical extraction scenarios.
Maxwell Dee
Maxwell Dee
30 June 2026
Benz Mining's drilling at Glenburgh's Hurricane Camp reveals thick, high-grade gold mineralisation linking key zones and extending the deposit down-plunge by over 400 metres, boosting the project's growth potential.
Maxwell Dee
Maxwell Dee
30 June 2026
BauMart has reached a pivotal milestone in its BuildMart Modular project with the delivery of four modular homes to Fremantle, marking a practical demonstration of offsite construction's efficiency and quality.
Victor Sage
Victor Sage
30 June 2026
Hawk Resources has confirmed significant near surface copper, silver, and molybdenum mineralisation in drill hole DD26CT004 at its Cactus project in Utah, extending the known mineralised zone southeast along the Cactus Corridor. Drilling is set to resume in July 2026 to test further extensions.
Maxwell Dee
Maxwell Dee
29 June 2026
Orion Minerals has confirmed the down-dip continuity of a high-grade copper zone at its Flat Mine East prospect with a new drill intercept of 3.96m at 4.64% Cu, including 0.95m at 14.19% Cu, extending the deposit beyond previous drilling.
Maxwell Dee
Maxwell Dee
29 June 2026
White Cliff Minerals’ 2026 drilling at the Rae Copper Project in Nunavut confirms visible copper sulphides along a key geological boundary, expanding the Hulk sediment-hosted system’s footprint to 6.3 square kilometres and validating its district-scale potential.
Maxwell Dee
Maxwell Dee
29 June 2026

Browse the archive

Full archive