Latest Resource Estimate News

Page 6 of 566
Orbminco has completed all on-ground work at its Majestic North gold project in Western Australia and redesigned the first mining stage around three shallow pits. The project still depends on ore sale terms, financing, approvals and a Final Investment Decision before development can proceed.
Maxwell Dee
Maxwell Dee
9 Nov 2026
ADX Energy has added three shallow gas prospects and upgraded several Austrian targets, taking its Upper Austria inventory to 28 prospects with 578.8 BCF of net mean prospective gas resources and 58.8 MMBBL of oil. The next tests are practical: GOLD-1 is planned for January 2027, while PERG is being positioned for drilling and potential farm-in interest.
Victor Sage
Victor Sage
9 Nov 2026
OzAurum Resources has added a maiden 34,000-ounce resource at Cross Fault, lifting the Mulgabbie North inventory to approximately 294,000 ounces. The deposit will enter a heap leach scoping study, but metallurgy, mining assumptions and funding remain important tests.
Maxwell Dee
Maxwell Dee
9 Nov 2026
American West Metals has outlined a 109.7Mt to 214.0Mt JORC Exploration Target beyond the existing resource at its Storm Copper Project in Nunavut. The estimate could represent up to 2.2 million tonnes of contained copper, but remains conceptual until drilling establishes a Mineral Resource.
Maxwell Dee
Maxwell Dee
9 Nov 2026
Gorilla Gold has reported a fresh set of high-grade intersections at Sovereign, including 9 metres at 7.9g/t gold, while drilling at Happy Jack confirmed a shallow lateritic zone above bedrock mineralisation. The results feed into planned 2026 resource updates across the company’s Western Australian projects, although true widths and economic significance remain unestablished.
Maxwell Dee
Maxwell Dee
9 Nov 2026
FireFly Metals has extended high-grade copper-gold mineralisation laterally and closer to surface at its Green Bay project in Canada, with results feeding into a revised resource estimate and feasibility study. The strongest intersections include 16.4 metres at 9.2% CuEq and 15.5 metres at 12.4% CuEq.
Maxwell Dee
Maxwell Dee
9 Nov 2026
Zeotech has more than doubled the JORC-compliant Mineral Resource at its Toondoon Kaolin Project to 45.6 million tonnes, with Measured and Indicated material now accounting for about 80% of the estimate. The headline expansion strengthens the case for further AusPozz evaluation, but remains a resource upgrade rather than a mine plan or production forecast.
Maxwell Dee
Maxwell Dee
9 Nov 2026
Andean Silver has uncovered multiple high-grade silver-gold shoots outside the current resource at Cerro Bayo, including new Lucia veins at Dagny and the Temer 4 vein near the processing plant. The results are being folded into resource growth work and production restart studies, with a resource update due in the first half of 2027.
Maxwell Dee
Maxwell Dee
9 Nov 2026
Midas Minerals has opened a new high-grade copper front at Hartbeespoort in Namibia, with shallow drilling returning up to 4 metres at 9.83% copper. At nearby Spaatzu, mineralisation now extends beyond 1.6 kilometres as the company advances several resource estimates for early 2027.
Maxwell Dee
Maxwell Dee
9 Nov 2026
Broken Hill Mines has outlined a conceptual Exploration Target at its Centenary Zone ranging from 13.2Mt to 17.1Mt, with grades of up to 12.5% zinc equivalent. The target sits outside the existing resource and close to the operating Rasp Mine, but remains untested as a Mineral Resource.
Maxwell Dee
Maxwell Dee
9 Nov 2026
QMines has exchanged binding contracts to acquire 25 freehold parcels adjoining its Mt Chalmers copper-gold project for $5.5 million. The land is intended to host key mine infrastructure and opens access for 103 planned drilling holes, although settlement, approvals and technical work remain ahead.
Maxwell Dee
Maxwell Dee
9 Nov 2026
Investigator Silver has reported a 10-metre silver intersection grading 2,662 grams per tonne from drilling around its Paris deposit in South Australia. The results strengthen the case for resource growth beyond the current DFS mine plan, but remain exploration-stage until further drilling and the planned 2027 resource update are completed.
Maxwell Dee
Maxwell Dee
9 Nov 2026

Browse the archive

Full archive