Latest Commercial Gas Production News

Page 1 of 3
Botala Energy has achieved continuous gas flow from stimulated well 3.5B at its Serowe coal bed methane project in Botswana. The technical milestone comes with a significant funding constraint: cash stood at A$286,000 at quarter end, before a subsequent A$1.35 million placement and planned share purchase plan.
Maxwell Dee
Maxwell Dee
30 Oct 2026
Botala Energy has secured A$1.35 million in a targeted placement to fund flow testing at its Serowe coal bed methane project, reserves certification and the final Phase 2 feasibility study. The raise also provides near-term funding while a proposed A$3.6 million investment from Botswana’s MDCB remains subject to commercial agreements.
Maxwell Dee
Maxwell Dee
23 Oct 2026
Botala Energy’s Serowe CBM project has reached its most important testing phase after well 3.5B delivered strong early water production and casing pressure. The operational progress is material, but the company still faces a funding hurdle and has not yet demonstrated sustained commercial gas flow.
Maxwell Dee
Maxwell Dee
30 Sept 2026
Elixir Energy has made significant progress on the Warkon Pilot in Queensland’s Taroom Trough, completing key feasibility studies for pipeline infrastructure and upstream plant design that position the project for commercial gas production.
Maxwell Dee
Maxwell Dee
2 Sept 2026
Kinetiko Energy is progressing rapidly from exploration to production with a major onshore gas discovery in South Africa, targeting first commercial compressed natural gas by late 2027 through a phased, capital-efficient development.
Maxwell Dee
Maxwell Dee
14 July 2026
Beetaloo Energy's Carpentaria-5H shale gas well delivered a steady 6.9 TJ/day average over a 30-day flow test, reinforcing the quality of the Velkerri Shale reservoir and supporting recoverable gas estimates ahead of the Carpentaria Gas Plant commissioning.
Maxwell Dee
Maxwell Dee
13 July 2026
Botala Energy confirms encouraging reservoir permeability at its Serowe-3.5B well in Botswana, setting the stage for hydraulic stimulation and production testing that could unlock commercial gas flows.
Maxwell Dee
Maxwell Dee
8 July 2026
Verbrec has secured a $21 million contract to upgrade the McArthur River Pipeline, enabling commercial gas flow from the Beetaloo sub-basin and bolstering Northern Territory's energy security.
Maxwell Dee
Maxwell Dee
29 June 2026
Botala Energy’s central production well 3.5B at the Serowe CBM Project in Botswana has completed key pre-stimulation steps, setting the stage for a multi-stage stimulation program and a 90-day flow test to evaluate commercial gas production potential.
Maxwell Dee
Maxwell Dee
15 June 2026
Botala Energy’s Pitse Pilot well 3.5B reveals 30% thicker and cleaner coal seams than expected, reinforcing the project's reservoir continuity and commercial gas production potential in Botswana.
Maxwell Dee
Maxwell Dee
2 June 2026
Tamboran Resources has reported record gas flow rates from its Shenandoah South 6H well and secured US$188 million in a capital raise, positioning the company to deliver first gas in the Beetaloo Basin by Q3 2026.
Maxwell Dee
Maxwell Dee
14 May 2026
Jade Gas Holdings has completed its appraisal program at the Tavan Tolgoi coal bed methane project, preparing to lodge its maiden gas reserve booking and advance development plans backed by fresh capital.
Maxwell Dee
Maxwell Dee
30 Apr 2026

Browse the archive

Full archive