Latest Geological Interpretation News

Page 2 of 39
PC Gold has reported broad, higher-than-modelled gold intersections at Spring Hill, including a 29.65-metre zone grading 4.32 g/t gold. Several assays remain outstanding, but the results extend Link Zone mineralisation about 30 metres beyond the current model ahead of a planned December 2026 resource update.
Maxwell Dee
Maxwell Dee
25 Sept 2026
Ballymore Resources has extended high-grade silver-lead-zinc-indium mineralisation closer to surface at its Torpy’s discovery in North Queensland. The latest drilling supports a multiple-shoot interpretation, but the project remains at an early exploration stage with assays pending and no Mineral Resource defined.
Maxwell Dee
Maxwell Dee
24 Sept 2026
White Cliff Minerals has expanded the assay-confirmed footprint of its Rae Copper Project beyond 11.5km, while new Danvers 3 drilling has placed visible copper sulphides within 19 metres of surface. The most eye-catching Danvers 3 interval still awaits laboratory assays.
Maxwell Dee
Maxwell Dee
24 Sept 2026
Lodestar Minerals has received all assays from a 12,417-metre, 106-hole RC drilling program at Ned’s Creek, supporting its existing exploration target across three gold prospects. A maiden Mineral Resource Estimate is now expected in the second half of October, although reported widths remain subject to geological interpretation and true-width confirmation.
Maxwell Dee
Maxwell Dee
24 Sept 2026
Famien Resources has used the year to pivot decisively from Australian exploration towards a 3,700km² gold portfolio in Côte d’Ivoire, backed by A$15.2 million in placements and A$13.1 million in cash. Early drilling has produced several high-grade intercepts, but the company remains loss-making and has yet to declare a mineral resource.
Maxwell Dee
Maxwell Dee
23 Sept 2026
Investigator Silver has begun a fully funded 30,000-metre drilling campaign at its Paris Silver Project in South Australia, targeting resource growth and extensions beyond the current mine plan. Assay results will arrive progressively, making the next few months a test of whether recent high-grade hits can translate into a larger, higher-confidence mineral inventory.
Maxwell Dee
Maxwell Dee
23 Sept 2026
Trek Metals has completed its maiden Phase 1 drilling campaign at Kuro, with 38 of 72 holes returning significant manganese and several high-grade shallow intersections. Phase 2 assays are now the next test of whether the system extends beyond the initial discovery area.
Maxwell Dee
Maxwell Dee
23 Sept 2026
G11 Resources has expanded its exploration footprint and reported a conceptual copper Exploration Target at Wilandra, while drilling near Tasmania’s Mt Lyell system continues. The company ended the year with $4.91 million in cash but remains loss-making and reliant on future funding to sustain exploration.
Maxwell Dee
Maxwell Dee
22 Sept 2026
GBM Resources has returned a broad 101-metre gold intersection at 2.63g/t from Lone Sister, with higher-grade intervals pointing to potential local grade uplift at Twin Hills. A further 8,400 metres of assays remain pending before the planned December-quarter resource update.
Maxwell Dee
Maxwell Dee
22 Sept 2026
Many Peaks Minerals has extended the tested vertical depth of gold mineralisation at its Ferké project by about 70%, with a deepest intercept returning 40.3 metres at 3.89g/t gold. The results support a planned resource update and preliminary assessment of underground mining, but remain exploration results outside the current resource.
Maxwell Dee
Maxwell Dee
22 Sept 2026
American Rare Earths has reported broad, near-surface rare earth mineralisation from the first six holes of its 2026 feasibility drilling program in Wyoming. The results are encouraging for geological continuity, but they cover only part of the program and do not yet represent a new resource estimate.
Maxwell Dee
Maxwell Dee
21 Sept 2026
RareX has identified a 74-metre zone of anomalous copper in drill hole KRC012 at the Niobe Prospect, with portable XRF readings peaking at 5,724ppm. The result broadens the Khaleesi exploration story, but laboratory assays are still four to six weeks away.
Maxwell Dee
Maxwell Dee
21 Sept 2026

Browse the archive

Full archive