Latest Lithium Brine Projects News

Page 1 of 9
Prairie Lithium has raised $1.42 million via an At-the-Market equity raise at a slight premium to fund the construction of its first production facility at the Prairie Lithium Brine Project in Saskatchewan.
Maxwell Dee
Maxwell Dee
20 May 2026
Patagonia Lithium reports exceptional core porosity results reaching 40% at 160m depth in Well Six at its Argentine Formentera project, alongside a lithium assay of 412ppm, reinforcing the project's substantial aquifer potential.
Maxwell Dee
Maxwell Dee
12 May 2026
Patagonia Lithium has cleared key environmental hurdles for its Formentera and Cilon mines in Argentina, advancing permits for a 1,000 tonne demonstration plant while drilling hits 150m depth at Well 7.
Maxwell Dee
Maxwell Dee
7 May 2026
Prairie Lithium has moved Pad #1 from groundwork to active building construction, backed by SaskPower's powerline installation and a binding Hydro Lithium offtake agreement that includes a A$10 million equipment contribution. First production is targeted for Q4 2026.
Maxwell Dee
Maxwell Dee
30 Apr 2026
Australian Critical Minerals (ASX:ACM) has launched its maiden diamond drilling campaign at the Flint Gold-Silver Project in Peru, backed by a $3 million capital raise and expanded land holdings. The drilling targets a 4 km high-sulphidation epithermal system, with advanced core logging technology deployed to accelerate geological insights.
Maxwell Dee
Maxwell Dee
30 Apr 2026
Lake Resources made solid progress on the Exploitation Environmental Impact Assessment for its Kachi Lithium Brine Project, targeting approval in Q3 2026, while maintaining strong liquidity and strategic partnerships.
Maxwell Dee
Maxwell Dee
28 Apr 2026
Galan Lithium has completed Phase 1 construction at Hombre Muerto West, secured A$40 million to expand production capacity by 30%, and is poised to begin lithium chloride concentrate shipments in H2 2026.
Maxwell Dee
Maxwell Dee
28 Apr 2026
Patagonia Lithium has reported strong assay and porosity results from its Formentera project in Argentina, alongside a successful $2.79 million capital raise that lifts its cash position to $3.4 million. The company is advancing drilling, seismic surveys, and plans for a 1,000 tonne lithium carbonate demonstration plant.
Maxwell Dee
Maxwell Dee
22 Apr 2026
Greenwing Resources’ latest geophysical analysis reveals the San Jorge lithium brine system extends to 1,000m depth with increasing lithium grades, setting the stage for a significant resource expansion.
Maxwell Dee
Maxwell Dee
20 Apr 2026
Patagonia Lithium Ltd (ASX:PL3) has reported exceptional porosity and specific yield results from Well Six at its Formentera Lithium Brine Project in Argentina, alongside a lithium assay of 412ppm. These findings support a sustainable pumping rate of approximately 160,000 litres per hour and underpin plans for an updated Mineral Resource Estimate.
Maxwell Dee
Maxwell Dee
9 Apr 2026
Greenwing Resources has initiated a scoping study at its 100%-owned San Jorge Lithium Brine Project in Argentina, appointing lithium brine specialist Zelandez to lead the work. The study aims to define development pathways and an economic framework for the project, which hosts a maiden Mineral Resource Estimate of 1.07Mt LCE.
Maxwell Dee
Maxwell Dee
8 Apr 2026
Patagonia Lithium Ltd (ASX:PL3) has announced positive exploration results from Well JAM 25-05 at its Formentera Lithium Project in Argentina, with core analysis revealing porosity values above regional averages and lithium assays ranging from 156ppm to 219ppm. These findings may support an expansion of the company’s Mineral Resource Estimate (MRE).
Maxwell Dee
Maxwell Dee
7 Apr 2026