Latest Lithium Brine News

Page 1 of 15
Patagonia Lithium’s latest packer tests at Formentera Well Seven reveal promising lithium brine quality and flow, suggesting potential expansion of its mineral resource.
Maxwell Dee
Maxwell Dee
21 May 2026
Prairie Lithium has raised $1.42 million via an At-the-Market equity raise at a slight premium to fund the construction of its first production facility at the Prairie Lithium Brine Project in Saskatchewan.
Maxwell Dee
Maxwell Dee
20 May 2026
Patagonia Lithium reports exceptional core porosity results reaching 40% at 160m depth in Well Six at its Argentine Formentera project, alongside a lithium assay of 412ppm, reinforcing the project's substantial aquifer potential.
Maxwell Dee
Maxwell Dee
12 May 2026
Power Minerals has kicked off a 3,800-metre diamond drilling campaign at its Morro do Ferro Rare Earths Project in Brazil, aiming to expand high-grade rare earth mineralisation and advance metallurgical studies following recent acquisition completion.
Maxwell Dee
Maxwell Dee
11 May 2026
Neometals is pivoting towards gold production with a funded JV at its Barrambie Ironclad deposit, while simultaneously progressing a substantial lithium-potash brine project in Utah.
Maxwell Dee
Maxwell Dee
8 May 2026
Patagonia Lithium has cleared key environmental hurdles for its Formentera and Cilon mines in Argentina, advancing permits for a 1,000 tonne demonstration plant while drilling hits 150m depth at Well 7.
Maxwell Dee
Maxwell Dee
7 May 2026
Patagonia Lithium has completed a key packer test at its Formentera project, confirming high aquifer porosity and flow rates at 110m depth, while submitting a comprehensive environmental study to local authorities.
Maxwell Dee
Maxwell Dee
5 May 2026
Prairie Lithium has moved Pad #1 from groundwork to active building construction, backed by SaskPower's powerline installation and a binding Hydro Lithium offtake agreement that includes a A$10 million equipment contribution. First production is targeted for Q4 2026.
Maxwell Dee
Maxwell Dee
30 Apr 2026
Australian Critical Minerals (ASX:ACM) has launched its maiden diamond drilling campaign at the Flint Gold-Silver Project in Peru, backed by a $3 million capital raise and expanded land holdings. The drilling targets a 4 km high-sulphidation epithermal system, with advanced core logging technology deployed to accelerate geological insights.
Maxwell Dee
Maxwell Dee
30 Apr 2026
Lake Resources made solid progress on the Exploitation Environmental Impact Assessment for its Kachi Lithium Brine Project, targeting approval in Q3 2026, while maintaining strong liquidity and strategic partnerships.
Maxwell Dee
Maxwell Dee
28 Apr 2026
Galan Lithium has completed Phase 1 construction at Hombre Muerto West, secured A$40 million to expand production capacity by 30%, and is poised to begin lithium chloride concentrate shipments in H2 2026.
Maxwell Dee
Maxwell Dee
28 Apr 2026
Mandrake Resources has identified overlapping placer claims staked by Utah Brine Corporation, linked to Neometals Ltd, on its Utah Lithium Project tenure. Legal demands have been issued to resolve the dispute, which affects a small portion of Mandrake’s 3.3Mt LCE resource.
Maxwell Dee
Maxwell Dee
24 Apr 2026